YA

Engineering

Work sequence

  1. Development of investment justification/feasibility study
  2. Development of basic design
  3. Design, including adaptation of Chinese solutions in accordance with TNPA RF
  4. Marketing and development of integrated equipment supply, including "Open book" method
  5. Audit of new Chinese factories at the development stage to ensure subsequent safety and quality of project implementation
  6. Project management, including planning, control of all stages of the project using modern methods project management (graphs, reporting tables, communications and headquarters system, collision control through a 3D model, photo/video reports, etc.);
  7. Study, revision, adaptation, translation of working design and other documentation from the manufacturer in accordance with the TNPA RF;
  8. Control of the production process at the manufacturer to achieve maximum quality and expediting of all processes, including the organization of participation of the Customers technical specialists;
  9. Equipment certification;
  10. Foreign economic activity services;
  11. Performance of logistics operations;
  12. Installation supervision works (ISS);
  13. Commissioning works (CWS);
  14. Risk management at all stages of the project with proactive measures among all project participants;
  15. < li>Development of working documentation, operating instructions;
  16. Revision, adaptation of the automation system (software) taking into account the Customers requirements;
  17. Training;
  18. Service during operation.
Engineering
сайт в разработке
Вверх